London 2012Managing the demolition of Angel Lane bridge
Summary
Essential to the success of any demolition and replacement scheme in proximity to important infrastructure is the implementation of a holistic approach to both the design and construction of the project. Angel Lane Bridge, located over a busy Network Rail (NR) corridor had to be demolished.