During the project lifecycle, the London Bridge Station Redevelopment Project (LBSR) team ensured that all works in station operational areas or works within one meter of a live operational asset have followed a strict control of contractor process for all construction activities.
The purpose of this lessons learnt case study is to capture the processes used, and to explain and document them for future knowledge transfer to other projects that may want to adapt these to their needs.