Published
15th October 2011Knowledge Type
Learning legaciesOrganisation
, Olympic Delivery Authority , BAM NuttallMajor Project
London 2012Suction excavation reduced risk of cable strikes
Summary
When carrying out multiple small excavations around the perimeter of the Park for the fence posts, the enormous number of buried services, both live and dead, meant that a suction excavator was much safer as it does not cut into cables and therefore minimised the risk of a cable strike.
You must be logged in to post a comment
SIGN IN