Bookmark(0)

Published

16th May 2019

Knowledge Type

Case study Lessons learned report

Organisation

, Network Rail Ltd

Major Project

Thameslink Programme

Of Interest To

Consultants Contractors Operators Private sector clients Public sector clients

Thameslink: As-Built Information Delivery

Summary

Improving the planning, management and delivery of as-built information during the close out phase of major projects

The close out phase revealed inefficiencies in the planning and management of the delivery of as-built information at the end of the London Bridge project. Noncompliance of the final deliverables to Network Rail standards led to re-work and minor delays, proving costly.

This case study provides recommendations, based on the direct experiences of the London Bridge Station Redevelopment project team, that will result in a more systematic and efficient delivery of as-built drawings.