Published
14th May 2019Knowledge Type
Learning legaciesOrganisation
, Network Rail LtdMajor Project
Thameslink ProgrammeThameslink: Designing Out Waste – Stations and Civils
Summary
This case study reviews the identified actions undertaken to reduce waste during design and construction of all major Thameslink Programme station and civils projects.
All the Thameslink major station and civils projects such as Blackfriars, Farringdon, London Bridge and Bermondsey Dive Under identified actions to reduce waste during design and construction.
You must be logged in to post a comment
SIGN IN