Published
15th May 2019Knowledge Type
Learning legaciesOrganisation
, Network Rail LtdMajor Project
Thameslink ProgrammeThameslink Vierendeel Truss Installation
Summary
The Vierendeel Truss at London Bridge supports the station canopy in the “wedge void” area, dividing the terminating platforms from the through platforms, and creating a full-height, open area above the main concourse. This case study reviews the key challenges, programme of works, methodology and logistics associated with its installation.
You must be logged in to post a comment
SIGN IN