Published
17th October 2011Organisation
, Olympic Delivery Authority , ArupMajor Project
London 2012Using an integrated CAD model for design coordination
Summary
Techniques to overlay computer aided designs (CAD) produced by multiple designers to achieve coordination are well established in the building industry, but are less common in general civil engineering and infrastructure. An integrated CAD model was used to manage the multi-disciplinary, multi-designer London 2012 project ensuring a coordinated design was achieved.
You must be logged in to post a comment
SIGN IN