Case Study
Filters
HS2 back to better programme-Building organisational resilience post COVID-19
11 Dec 2023
Background and industry context The COVID-19 outbreak in early 2020 [1] had a massive impact on the construction industry and UK society.[2] Our traditional ways of living and working were halted almost overnight. HS2 was not isolated from the impacts. Staff were…
BBV behavioural programme ‘Safe at heart’
8 Dec 2023
Introduction The Integrated Project Team for the northern section of High Speed Two (HS2) Phase One – Balfour Beatty VINCI (BBV) – developed and launched an employee and supply chain led behavioural programme called “Safe at Heart” in April 2022. A previous…
Materials by Rail (MbR) to HS2 on-site stockpiles
8 Dec 2023
Background and industry context Rail operation has successfully provided material logistics solutions to many major civil engineering projects over the years. HS1, West Coast Route Modernisation, The Olympic Park and the nuclear power station build at Hinkley point C to name but…
Align worker travel service
8 Dec 2023
Background and industry context This paper is presented as part of the works to deliver the Main Works Civils Contract (MWCC) for the central section of High Speed Two (HS2) Phase One which includes the Colne Valley Viaduct and Chiltern Tunnels, being…